Oakland City Council, following months of negotiations with Caltrans, adopted a resolution ending a tolling agreement and settling their potential lawsuit. The full terms may be found here:
CITY OF OAKLAND - LIST OF ENHANCEMENT PROJECTS
PHASE I PROJECT LIST:TOTAL : $8,200,000
Traffic Signal Improvements: $2,650,000 (2008 estimated cost)
Improve intersections in the project and surrounding on and off-ramp areas by installing new signals, making intersection geometric improvements, upgrading existing signals, to improve pedestrian, bicycle and vehicular access and safety. Locations include:
• Tunnel Road/Hiller Drive/Highway 13 intersection
• Caldecott Lane/Kay Overcrossing: New signal
• Caldecott Lane/SR24 ramps: New signal
• Broadway/Lawton: New signal
• Broadway/Keith, College/Keith. College/Miles, Telegraph on/offramps: Signal upgrades
Sidewalk Improvements $3,650,000 (2008 estimated cost)
• Tunnel Road: Install sidewalks along Tunnel Road between Berkeley border and the Tunnel Road/Hiller Drive/Highway 13 intersection as specified by the Oakland Pedestrian Master Plan.
• Broadway: Install sidewalks along Broadway between Golden Gate Ave. and Kay Overcrossing as specified by the Oakland Pedestrian Master Plan.
• Caldecott Lane: Install sidewalks-from Parkwoods condominiums to Tunnel Road.
Bicycle Improvements $500,000 (2008 estimated cost)
• Tunnel Road: Complete the bikeway between the Berkeley border and the Tunnel Road/Hiller Drive/Highway 13 intersection as specified in the Oakland Bicycle Master Plan
• Broadway/Overcrossing/Caldecott Lane: Complete bikeway between Broadway at: Golden Gate Ave and Caldecott Lane at Tunnel Road as specified in the Oakland Bicycle Master Plan
• Bike route signage improvements to BART stations
• High Capacity Bicycle Parking at Rockridge and MacArthur BART stations
• Replacement of on-street parking (i.e. bike racks) in commercial areas, i.e. College Avenue, due to citywide parking meter removal program
LandvaleBridge: $200,000 (2008 estimated cost)
Complete an alternatives analysis of possible pedestrian and bicycle connections from the Tunnel Road/Hiller Dr/Highway 13 intersection to the Lake Temescal Path (at Broadway). The analysis should include cost estimates for the alternatives and identify a recommended alternative, as well as potential state, regional and local funding options;
Soundwalls: $1,200,000 (2008 estimated cost)
At priority locations, to be identified.